This project is for the office fit-out of Level 12 and 13 of an existing UTS building. CB10.
Mechanical services include the provision and installation of all mechanical systems. Mechanical systems include, air conditioning, ventilation, outside air ventilation and BMS Controls Upgrade.
Copyright 2024 @ ABS AIR COnDITIONING and Sheetmetal. All rights reserved.